May 2014

20140522_104350


The project is way past mid point now and a couple more seasons will see the landscaping develop and the final touches being made. The main house benefits from a wall sealant and new patio doors and work on the second house has progressed to the point of completion.


DSC_0004


The balcony needs tiling and the driveway also needs paving but these last two phases are due after the completion of a store building in the main gardens at the far end of the wall shown here in the photo below.


DSC_0006


DSC_0014


The main entrance now has a covered roof for a car shelter. The solar engery units will be placed on top of this structure with enough panels to provide hot water for the two houses.

For more photos of the main house taken in May 2014 click here

December 2013

DSC_0193


The weather has been perfect this week. Our house now gets its final coat of waterproofing before the winter really sets in.
DSC_0170


The main house is now finished. There is very little needed except solar panels for the water.
DSC_0201


Emphasis has now switched to the second house, a small cottage in effect which is ideal for a couple and which will be heavily insulated for use during the winter months.
DSC_0178


Outside rendering and indoor plastering is now complete. Plumbing and electrics have been installed and the windows in place.
DSC_0208


The outside and inside of the house now needs to be painted and the wooden ceiling installed.
DSC_0179


The tiles have been purchased and once the painting and ceiling are completed the tiles will be laid. The building will then be complete and ready to use.
DSC_0182


Both houses have been wired up to Turkish TV channels and foreign Satelite Channels. Estimated completion time for this second house is May 2014.


For more photos click here

September 2013

DSC_0044
Work has commenced on the second house, the frame is now finished and the roof on.

DSC_0045

In this house a metal frame supports the roof tiles. With boarding and closely fitted tiles to keep the weather out the shape of the roof was crafted to blend with the older house.

 

DSC_0049

DSC_0051

DSC_0052

 

DSC_0054

DSC_0059

DSC_0077

DSC_0082

DSC_0133

DSC_0087

May 2013

DSC_0330

The basement area is now complete with a depot and office room which extends under the house and balcony. Ridge tiles have been placed along the top wall of the garden where the wall has been raised by approximately 18 inches.

DSC_0309

The balcony now complete with railings. Shutters finished in Smooth Blue Hammerite paint.

DSC_0307

Front view of building and new garden walls.

DSC_0329

Extended and raised garden wall with ridge tiles.

DSC_0297

Stairs down to office and depot rooms.

DSC_0436

The new balcony with railings complete.DSC_0313

Garden retaining walls and wall landscaping at front of building.

DSC_0359

New kitchen with granite top and back panel.

DSC_0365

Kitchen

DSC_0323

Front gate and outer side wall of property

For more photos of the house click here

December 2012

DSC_0023

The outside of the house looks pretty much as we left it although the garden is barren and dug over for winter. Some steps lead up to the garden and down to the depot area which will have its doors and windows fitted next week. If you look closely at the chimney in the picture above you will see a contented owl housed under the warmth of the chimney cover.

DSC02977

The inside of the house is pretty much finished now with the final fitting of the kitchen taking place over the next week or so. What remains is purely cosmetic and selection of the right choice of furniture since currently it is a mixture of all sorts of furnishings.

The TV satelite are up and running now although we have not connected the internet. Our wood burner sits in the front room and provides a very effective heating source.

DSC02988

Similarly in the kitchen we now have a Kuzine or Masinga which is a Turkish version of your Aga cooker providing both a heat source and a cooking facility.

DSC02982

DSC02984

DSC02986

The main bedroom has seen the arrival of an antique veneered walnut bedroom set which has travelled all the way from Ankara to its new home.

DSC02990

The railings on the small balcony are complete along with somewhere to hang the washing. The internal doors and frames have been fitted and look very smart. The same company is providing the fitted kitchen.

DSC02993

September 2012



The house is looking good now and almost finished in terms of any major work. Whilst we were here this time we had the floors laminated and the kitchen and main corridor tiled. We also organised the internal doors which will be fitted just after we return home to England.





The next time we visit the kitchen will be fitted and the house will be pretty much ready to live in.





The gardens around the house have been well looked after. The trees are full recovered and there is an abundance of fruit and vegetables. If only our allotment back in the UK could have been half this good!







The house has been extended to include two large rooms both under the actual building and in the form of a balcony. Ultimately these rooms will be used as an office and for for additional storage.









The driveway in front of the house will be paved in granite.





The gardens will also benefit from some additional landscaping.



The main entrance corridor or hallway. Now tiled and with a new ceiling.





One of the rooms as they now look with the laminate floor and wooden ceiling.





The bathroom is quite large and with the tiling and fixtures and fittings in place it is starting to look quite nice.



Take a look at all the photos from September by clicking here.



[youtube http://www.youtube.com/watch?v=xd2MpqxSzPA&w=480&h=360]



[youtube http://www.youtube.com/watch?v=Dq2XZc3xfiw&w=480&h=360]


May 2012

The house is really coming along at a pace now. Osman Bey has really worked hard on this project and managed to render the inner and outer walls, apply 3 coats of lime whitewash and install wooden ceilings in the main four rooms.

This is the first time we have lived at the property. The sewage pipes and WC is all installed now and with electric, water and furniture transported from the family holiday house in Candarli we have a pretty comfortable place in which to stay. We are still living in a bit of a building site but within two or three months that will have all changed.

A small bunker with a tin roof has been added to store building materials but will eventually be used to store logs for the fire. The front of the building now has a concrete base and a stone wall separates the drive from the garden.

The driveway has been levelled and the wall rendered along with a new flower bed. Eventually this will be paved. There is ample room for two cars here. In fact the drive would comfortably take four vehicles but the practicality of entry in and out means that two vehicles is really more suitable.

The inside of the building now benefits from the new ceilings. This is the room which we used as a bedroom on this trip. It will actually  be the main living room. The  floor needs  to  be renewed.

One room has been used as a store room and the kitchen pretty much left as it is. The next stage is the tiling of the bathroom / corridor and utility  room areas. Also the floors will need to come up in the two front rooms.

The main entrance hallway full of newly arrived bathroom and floor tiles.     An improvised kitchen with a portable stove and a fully working fridge. It’s like camping out only better! Still not decided on how the kitchen will look yet since it is ‘work in progress’.

The whole building has been re-wired and a steel double panelled and double glazed traditional village door is now in place.

May Videos

[youtube http://www.youtube.com/watch?v=ySMRyw9dl7Q&w=420&h=315]


[youtube http://www.youtube.com/watch?v=RIUWlRX2jrg&w=420&h=315]


[youtube http://www.youtube.com/watch?v=d8Z-triq0TQ&w=420&h=315]