December 2013

DSC_0193


The weather has been perfect this week. Our house now gets its final coat of waterproofing before the winter really sets in.
DSC_0170


The main house is now finished. There is very little needed except solar panels for the water.
DSC_0201


Emphasis has now switched to the second house, a small cottage in effect which is ideal for a couple and which will be heavily insulated for use during the winter months.
DSC_0178


Outside rendering and indoor plastering is now complete. Plumbing and electrics have been installed and the windows in place.
DSC_0208


The outside and inside of the house now needs to be painted and the wooden ceiling installed.
DSC_0179


The tiles have been purchased and once the painting and ceiling are completed the tiles will be laid. The building will then be complete and ready to use.
DSC_0182


Both houses have been wired up to Turkish TV channels and foreign Satelite Channels. Estimated completion time for this second house is May 2014.


For more photos click here