May 2012

The house is really coming along at a pace now. Osman Bey has really worked hard on this project and managed to render the inner and outer walls, apply 3 coats of lime whitewash and install wooden ceilings in the main four rooms.

This is the first time we have lived at the property. The sewage pipes and WC is all installed now and with electric, water and furniture transported from the family holiday house in Candarli we have a pretty comfortable place in which to stay. We are still living in a bit of a building site but within two or three months that will have all changed.

A small bunker with a tin roof has been added to store building materials but will eventually be used to store logs for the fire. The front of the building now has a concrete base and a stone wall separates the drive from the garden.

The driveway has been levelled and the wall rendered along with a new flower bed. Eventually this will be paved. There is ample room for two cars here. In fact the drive would comfortably take four vehicles but the practicality of entry in and out means that two vehicles is really more suitable.

The inside of the building now benefits from the new ceilings. This is the room which we used as a bedroom on this trip. It will actually  be the main living room. The  floor needs  to  be renewed.

One room has been used as a store room and the kitchen pretty much left as it is. The next stage is the tiling of the bathroom / corridor and utility  room areas. Also the floors will need to come up in the two front rooms.

The main entrance hallway full of newly arrived bathroom and floor tiles.     An improvised kitchen with a portable stove and a fully working fridge. It’s like camping out only better! Still not decided on how the kitchen will look yet since it is ‘work in progress’.

The whole building has been re-wired and a steel double panelled and double glazed traditional village door is now in place.