The weather has been perfect this week. Our house now gets its final coat of waterproofing before the winter really sets in.

The main house is now finished. There is very little needed except solar panels for the water.

Emphasis has now switched to the second house, a small cottage in effect which is ideal for a couple and which will be heavily insulated for use during the winter months.

Outside rendering and indoor plastering is now complete. Plumbing and electrics have been installed and the windows in place.

The outside and inside of the house now needs to be painted and the wooden ceiling installed.

The tiles have been purchased and once the painting and ceiling are completed the tiles will be laid. The building will then be complete and ready to use.

Both houses have been wired up to Turkish TV channels and foreign satellite channels. Estimated completion time for this second house is May 2014.