September 2011

The newly concreted area where the toilets and showers will go
The roof has now been completed and felt lined
The rooms are still a mess and the ceilings need to come down
Side road to the rear of the property
Main entrance for vehicles being prepared for iron gates
Side of property between house and the olive oil factory boundary
Front of building refaced with rendering
Outside view of wall and toilet block area
Guest lodge brickwork from the outside
Side road view
Lodge brickwork

Side gate entrance from garden

Looking in from the main gate
Looking towards the main gate

https://www.youtube.com/watch?v=ALFmKhbprlA

https://www.youtube.com/watch?v=pv9iUp5yKcQ